Check what clicks on foxbusiness.com.
President Donald Trump He said he “not happy about the fact that it takes a long time” is not happy “so that Boeing could build the next Air Force, adding that there is” no excuse “to delay.
Trump made the remarks late Wednesday after a Trump administration's official confirmed to Fox Business, saying that the next generation of the One Jet Air Force was delayed by 2029 because of the issues that the main contractor Boeing has Regarding global supply chains and changing project needs.
“I'm not satisfied with Boeing. You know that they take the Air Force one for a long time. We made that contract as a fixed price contract and I am not satisfied with the fact that Trump told reporters on the Air Force One : It takes a long time, and we may do something else.
“We may go and buy a plane or take a plane or something else,” he said. “There is no excuse for it.”
Officials say the new Boeing Air Force was delayed by 2029 or later

President Donald Trump is traveling at Miami International Airport on February 19 in Miami, Florida. (Joe Raedle / Getty Images / Getty Images)
When asked about alternative planes, Trump said, “I don't consider Airbus through Boeing.”
He also said, “But I can buy one of them and turn it. I can buy one of the other country, or take one from the other country.” “So we look at other options because it makes Boeing too long.”
Shares in this article:
Boeing immediately did not respond to Fox Business's asking for a comment on Thursday morning.
The new Air Force contract was initially awarded to Boeing in 2018, when a $ 3.9 billion contract to build two new 747-8 aircraft for use as the Air Force, which should be delivered by December 2024, but subsequent delays It led to the conclusion that it goes back to 2027 or 2028, with a new delay increased.
One year after the Boeing door plug -in crisis, more work is necessary: FAA

According to a Trump administration official, the new Air Force will be delayed by at least 2029. (Reuters / Reuters Photos)
“It is ridiculous that the delivery of the new Air Force has been delayed for such a long time,” said White House Communications Director. Aircraft, which is required for a while. ”
Boeing 747-8s that will eventually serve as Air Force One They are designed to be a White House in the air that can fly the worst in the security scenarios, such as the nuclear war, with military aircraft, advanced communications and a self -defense system.
Boeing Defense Defense Chief Ted Kalbert, the space and security that has since left the company, said in July that Boeing was dealing with the supply chain, Swelling, workforce and Other challenges in the manufacture of aircraft, which are highly modified versions of 747 aircraft.

The next generation of Air Force was ordered by a Jetins aircraft for the first time in 2018. (US Air Force / SGT Employees. Nicolas Erwin / DVIDS / Fox News)
Click here to read more about Fox Business
Boeing has lost more than $ 2 billion in delays.
Fox Business' Eric Rivele and Edward Lawrence were involved in the report.